Training

Courses taught by people who run projects.

PMI certification and hands-on Primavera P6, live online or in class at our Oshawa office.

  • PMP · PMI-RMP · PMI-SP
  • P6 Basic 4 weeks, Advanced 6 weeks
  • Answer a question on the card
Try a practice question

PMP

Loading a question…

Your score0 / 0

Courses

Pick a course

Contact us for pricing and upcoming class dates. PMI exam fees are paid to PMI.

PMP exam preparation

PMP exam preparation

Project Management Professional: predictive, agile and hybrid delivery.

180questions
230minutes
35 hrseducation required
  • 35-hour live bootcamp
  • Certificate of 35 contact hours
  • Study guide and formula sheet
  • 4 full-length mock exams
  • PMI application review

Primavera P6

Course outlines, week by week

Two evening sessions a week, 3 hours each. One building project carries through both levels.

Week 1P6 foundations
  • Navigating P6 Professional
  • EPS, OBS and user access
  • Creating a project and defaults
  • Global, project and resource calendars

LabSet up a mid-rise building project.

Week 2Building the schedule
  • WBS
  • Activities and duration types
  • FS, SS, FF, SF with lags
  • Activity codes and steps

LabBuild the full logic network.

Week 3Scheduling & critical path
  • Scheduling (F9) and options
  • Total float, free float, longest path
  • Constraints and float
  • Grouping, filters and layouts

LabFix open ends and excessive constraints.

Week 4Baselines, updating & reporting
  • Creating and assigning baselines
  • Progress updating and the data date
  • Gantt formatting and PDF printing
  • Reports and the report wizard

LabBaseline, update and report the project.

From baseline to progress update

A learner builds, baselines and updates a small fictional schedule, then explains the slip: the workflow you practise in P6 Basic, week 4.

AddLinkBaselineUpdateCompare✓ BL1 savedActivity5 Apr12 Apr19 Apr26 Apr3 MayST-1010ExcavationST-1020FootingsST-1030Foundation wallsST-1040BackfillMS-1050Foundations doneData date Mon 26 Apr100%100%25%0%2 days late
Planned or remaining (outline) Progress (solid) Baseline BL1 (hatched) Milestone: current (solid), baseline (hollow) Data date (dashed)

6 steps · 16.5 seconds · no soundShown: the finished update and the learner's variance report. Press Play to watch it built step by step.

Learner's output · baseline vs update

MS-1050 Foundations done

Baseline (BL1)
Wed 5 May 2027
Current forecast
Fri 7 May 2027
Variance
−2 working days (later than baseline)
Data date
Mon 26 Apr 2027

Variance explanation: Footings (ST-1020) took 8 working days instead of 6 while waiting for a rebar inspection, and because it drives the foundation walls and backfill, MS-1050 now finishes 2 working days after its baseline.

Fictional training data. 5-day work week, no holidays.

  1. Add activities
  2. Link the logic
  3. Save the baseline
  4. Move the data date
  5. Record progress
  6. Compare and explain

Example assignments

What you build, and what it looks like finished

Each level builds toward output like this, using the course project. These previews use a simplified, original drawing of a fictional mid-rise building schedule on a 5-day calendar.

P6 Basic · assignment

Build and baseline the schedule

  1. Create the activities and assign the 5-day project calendar.
  2. Link them with finish-to-start and start-to-start relationships.
  3. Schedule (F9) and identify the longest path.
  4. Save the schedule as the project baseline.
d0d10d20d30d40d50Handover day 48A1000Site setupA1010FoundationsA1020StructureA1030RoofA1040Services rough-inA1050FinishesM1060Handover
Longest path (IDs in bold)Has float: A1040, 6 days

P6 Advanced · assignment

Update progress and explain the variance

  1. Record actual dates and remaining durations at the new data date.
  2. Reschedule and find the milestone that moved.
  3. Trace the cause along the longest path.
  4. Write a one-paragraph variance explanation.
d0d10d20d30d40d50d60Baseline d48Update d52A1000Site setupA1010FoundationsA1020StructureA1030RoofA1040Services rough-inA1050FinishesM1060Handover
BaselineUpdate, movedUpdate, unchanged
Example student commentary. Handover (M1060) moved 4 working days later, from day 48 to day 52. Structure (A1020) took 19 days instead of the planned 15. A1020 is on the longest path, so Roof, Finishes and Handover each moved 4 days. Services rough-in (A1040) absorbed the change within its 6 days of float.

Mock exams

Full-length mock exams

Timed, exam-length practice with worked explanations. Sold alone or included with each course.

Candidate studying for an exam

PMP mock pack

4 exams · 180 questions · 230 min

  • Predictive, agile and hybrid
  • Score by domain
  • 90 days access
Contact us
Most requested

PMI-SP mock pack

3 exams · 170 questions · 210 min

  • CPM, float and network maths
  • Score by domain
  • 90 days access
Contact us

PMI-RMP mock pack

3 exams · 115 questions · 150 min

  • EMV, decision trees, Monte Carlo
  • Score by domain
  • 90 days access
Contact us

Free practice

Ten random questions. See where you stand.

Each attempt draws a fresh set from the question bank.

Question 1 of 10

PMP

Loading question…

Exam facts are from PMI's certification pages. Check PMI's current handbook before you apply.

Not sure which course fits?

Tell us your role, experience and target exam date. We will send a recommendation, pricing and class dates.